LOCATION: Quarry ARTICLE YEAR 2002
ACTIVITY: Maintenance & Housekeeping COMPANY: Hanson Aggregates
SUB ACTIVITY: N/A COMPANY LOCATION: Pottal Pool Quarry, Staffordshire
BEST PRACTICE No: BP247 COMPANY TEL: 01785 712 607
COUNTRY OF ORIGIN: United Kingdom
TITLE  
Easy mount brackets
ARTICLE
Pottal Pool Quarry is one of Hanson’s sand and gravel operations in Staffordshire. In common with a high percentage of quarries, the inclined conveyors have walkways along one side only. When the need arises to change the brackets supporting the return idlers, (other than near ground level), the job takes 40 minutes per bracket, half of which entails the fitter wearing a full safety harness, lying on his back on boards inserted into the conveyor trestle structure.

Workforce participation resulted in the design of a bracket, which can be fitted in half the time, and from one side of the conveyor only, the fixing bolts being located on the walkway side only. (Clearly, harnessed-access is still needed, albeit for some five minutes only, whilst cutting away the old bracket on the non-walkway side).
ARTICLE IMAGES




pdf document available
Go back to search critera
Sharing health and safety resources helps us all work towards Zero Harm
  • Aggregates |

  • Asphalt |

  • Cement |

  • Contracting |

  • Dimension Stone |

  • Lime |

  • Precast Concrete |

  • Mortar |

  • Readymix |

  • Recycling |

  • Silica Sand |