TITLE
New hopper to remove semi-dry concrete sticking
ARTICLE
A build-up of material was occurring in the transfer hopper because of the feeding of semi-dry concrete into the slab press. The way that this had been dealt with in the past was by installing vibrators to the sides of the hopper and for someone to clean the insides manually. This was undesirable because the hopper was accessed from a ladder into an awkward and confined space. In addition to this, the cleaning process was only a temporary expedient.

The machine operator led the development of a hopper lined with thick conveyor rubber. This has produced a hopper that rarely suffers from build-up of semi-dry concrete. This solution has also removed the need for heavy manual intervention as, on the infrequent occasions that the material does build up, a simple tap on the side removes it.


ARTICLE IMAGES
Click image to enlarge

rubber hopper close-up
Click image to enlarge

rubber hopper in the distance
pdf document available
Go back to search critera
Sharing health and safety resources helps us all work towards Zero Harm
  • Aggregates |

  • Asphalt |

  • Cement |

  • Contracting |

  • Dimension Stone |

  • Lime |

  • Precast Concrete |

  • Mortar |

  • Readymix |

  • Recycling |

  • Silica Sand |