Best Practice

LOCATION: Transport ARTICLE YEAR 2005
ACTIVITY: Transport / Delivery COMPANY: CEMEX UK Materials
SUB ACTIVITY: On-highway COMPANY LOCATION: Haydock Plant, Merseyside
BEST PRACTICE No: BP48 COMPANY TEL: 0780 121 6825
COUNTRY OF ORIGIN: United Kingdom
TITLE
Loading chute for heavy mortar bags
ARTICLE
The CEMEX Mortar Plant at Haydock has devised a simple modification to existing equipment to improve
the method of loading one tonne bags from the central mixer unit.

The company was concerned that its forklift operators had to position the bags below the discharge bowl of the mixer, which was five metres above the yard. There was a risk that, if the product was discharged too quickly from the mixer, the momentum of the product hitting the bag could over-balance the fork lift truck.

The company decided to utilise an existing pneumatic system used to bring a wash-out chute under the plant. A frame was fabricated, on which was mounted a seamless rubber sock supplied by the Conspare Company. This new chute arrangement also had the added benefit of enabling a more accurate loading of the mortar into tubs that had been brought in by customers on the back of their vehicles.
ARTICLE IMAGES




pdf document available
Go back to search critera
Sharing health and safety resources helps us all work towards Zero Harm
  • Aggregates |

  • Asphalt |

  • Cement |

  • Contracting |

  • Dimension Stone |

  • Lime |

  • Precast Concrete |

  • Mortar |

  • Readymix |

  • Recycling |

  • Silica Sand |