Best Practice

LOCATION: Readymix or mortar plant ARTICLE YEAR 2008
ACTIVITY: Transport / Delivery COMPANY: Tarmac
SUB ACTIVITY: Mobile Plant COMPANY LOCATION: Thornton Concrete, Blackpool
BEST PRACTICE No: BP534 COMPANY TEL: 07702 632234
COUNTRY OF ORIGIN: United Kingdom
TITLE
Skip elevator system for loading ‘bagged admixtures’
ARTICLE
Loading bagged admixtures to ready-made concrete presents a number of safety problems:

- Working at heights: climbing ladders to the truck mixer;
- Manual handling: involves repetitive movements;
- Contact with raw materials; and
- Slips, trips and falls.

The idea that was developed to overcome all these problems was taken from an existing elevator system which was modified to suit the needs of the site. The system uses a mechanical process which lifts bags of admixture via a skip/hopper elevator up to the truck mixer loading chute. The operation ensures the full contents of the skip/hopper are safely discharged into the truck mixer drum. Concrete can then be loaded into the mixer on top of the admixtures ensuring that the admixtures are mixed thoroughly.

This has removed all the dangers that were present beforehand.
ARTICLE IMAGES




pdf document available
Go back to search critera
Sharing health and safety resources helps us all work towards Zero Harm
  • Aggregates |

  • Asphalt |

  • Cement |

  • Contracting |

  • Dimension Stone |

  • Lime |

  • Precast Concrete |

  • Mortar |

  • Readymix |

  • Recycling |

  • Silica Sand |