Best Practice

LOCATION: Asphalt/Coating plant ARTICLE YEAR 2008
ACTIVITY: Manual handling and storage COMPANY: Aggregate Industries
SUB ACTIVITY: N/A COMPANY LOCATION: Yeoman Asphalt, Croydon
BEST PRACTICE No: BP537 COMPANY TEL: 0208 6844303
COUNTRY OF ORIGIN: United Kingdom
TITLE
Manual handling during an asphalt plant mesh change
ARTICLE
The asphalt plant has seven screen meshes which cause manual handling issues when they need to be changed. Changing the screen meshes on the vibrating screen deck was the main concern. The hazards occurred when the screen had to be carried up steep steps and down a narrow walkway.

The company decided to expand the top walkway, using a large open area around the screen level. A team of engineers was tasked with designing a working platform and load bearing beams to enable the lifting of the screen meshes up to the top of the plant using an electric hoist or a manual pulling block.

This has significantly reduced any manual handling whilst undertaking this task and has reduced time spent changing the screens. It has also helped the company store larger spares securely and closer to the area where they would be needed.
ARTICLE IMAGES




pdf document available
Go back to search critera
Sharing health and safety resources helps us all work towards Zero Harm
  • Aggregates |

  • Asphalt |

  • Cement |

  • Contracting |

  • Dimension Stone |

  • Lime |

  • Precast Concrete |

  • Mortar |

  • Readymix |

  • Recycling |

  • Silica Sand |