ARTICLE
During an interactive audit, a loading shovel operator pointed out that filling the machine’s auto-greaser was a major task. It required four cartridges to be manually pumped in order to fill the tank. This had to be done twice a week.

This type of greaser was fitted to two other vehicles at the site, whose operatives experienced the same problems.

After discussions with site maintenance staff, it was decided that a mobile greaser would make the task easier. A 12.5kg grease tub and pump was mounted on to a trolley. The unit uses compressed air and is coupled with a quick release mechanism to the plant’s auto greaser reservoir.
ARTICLE IMAGES




pdf document available
Go back to search critera
Sharing health and safety resources helps us all work towards Zero Harm
  • Aggregates |

  • Asphalt |

  • Cement |

  • Contracting |

  • Dimension Stone |

  • Lime |

  • Precast Concrete |

  • Mortar |

  • Readymix |

  • Recycling |

  • Silica Sand |