ACCIDENT / INCIDENT DETAILS
Due to access issues to areas of the site, one 3 tonne dumper and two 1 tonne skip loader dumpers were being utilised to transport asphalt from the stock pile to the mini paver/hand lay operations.

As one of the 1 tonne dumpers had tipped its load of asphalt into the paver hopper, the dumper driver reversed away from the paver (across a gradient), with the dumper bucket still in it’s elevated position: and the dumper overturned due to the raised centre of gravity and narrow wheel track. Fortunately, the driver was not injured during the incident although he was slightly shaken.
ACCIDENT / INCIDENT IMAGES
Click image to enlarge

Over turned dumper
Click image to enlarge

Over turned dumper
LEARNING POINTS / ACTIONS TAKEN
During the pre-site visit/walk through concerns were raised about the gradients and the difficulty of carrying out the work. The gradients were referenced in the Site Specific Risk Assessment but had not been transferred onto the Job Briefing Sheet.

The gradients were measured during the investigation and were found to vary between 1:5 to 1:15, running both along and across the footpath. It also became apparent that control measures identified during previous dumper incident investigations had not been implemented.

• The company has banned all 1 tonne skip loader dumpers from its operations and alternatives are being sought e.g. tracked 1.5 tonne dumpers, JCB 2CX, 3 tonne dumper etc.

• The gradients on site must be measured prior to work commencing, and checks must be made with the plant hire companies and operator’s hand books, to make sure that the gradients do not exceed the plants’ safe operating capabilities.

• Adequate control measures must be developed and included in the Site/Task specific Risk Assessment, added to the Job Briefing Sheet/Safe System of Work and adequately communicated to all personnel on site.

• If at any time, anyone on site is of the opinion that the work being undertaken is unsafe, they should raise their concerns with their supervisor/line manager and seek to find a safer alternative method of working.

where to buy abortion pill

buy abortion pill online abortion pill how to order the abortion pill online
LEARNING POINTS / ACTIONS IMAGES




Go back to search critera
Sharing health and safety resources helps us all work towards Zero Harm
  • Aggregates |

  • Asphalt |

  • Cement |

  • Contracting |

  • Dimension Stone |

  • Lime |

  • Precast Concrete |

  • Mortar |

  • Readymix |

  • Recycling |

  • Silica Sand |