Mixer chute electric winch system |
Retford Concrete Plant produces concrete through a Miller’s mixer, discharging through a chute into a mixer truck.
The chute is suspended below the mixer by a frame and must be lowered to ground level for maintenance or cleaning two to three times a day.
The only access to clean the chute was through the mixer door necessitating the chute to be lowered using a scaffold tower. The chute’s securing bolts then had to be removed and a block and tackle used to secure the chute. This was very time consuming and required substantial manual handling.
A modification was carried out to enable the chute to be lowered using a winch and bearings attached to the frame.
The operator now releases the frame by unscrewing two securing nuts and then pressing a button to lower the chute. |