Enhancements to delivery of bitumen |
The workforce at this asphalt plant has worked together with management and suppliers to devise a number of improvements to the bitumen delivery system. Personnel now receive better training, a clearer key control system for the storage tanks is in operation, new signage is in place and the coupling points for the delivery pipe have been enhanced. The new-style flange coupling involves a “drop in”, square-shaped slot arrangement. The male connection on the delivery hose is lowered into a female connection on the tank inlet pipe. Once in place, the driver can secure the fixing bolts without needing to hold the pipe, hence reducing the physical effort that was necessary previously.
The relatively inexpensive measures taken have generated positive feedback and will be rolled out to other Hanson sites. |