• About
  • Log on
  • Register
  • Contact
  • Home
  • Safety Resources
    • Incident Alerts
    • HiPos Report
    • Guidance
    • Good practice
    • Toolbox talks
    • Hot Topics
    • Other resources
    • Videos
    • Safequarry App
  • The Fatal 6
    • Overview
    • 1. Contact with moving machinery and isolation
    • 2. Workplace transport and pedestrian interface
    • 3. Work at height
    • 4. Workplace Respirable Crystalline Silica
    • 5. Struck by moving or falling object
    • 6. Road traffic accidents
  • Vision Zero
    • Overview
    • Employee Guide
    • Core Values
    • Fatal 6
  • Safer By
    • Overview
    • Safer by competence
    • Safer by association
    • Safer by design
    • Safer by partnership
    • Safer by sharing
    • Safer by Leadership
  • Public Safety
    • Summary
    • Stay Safe
    • Cycle Safe
  • Health & Wellbeing
    • Quarries Partnership - Dust
    • Mental Health & Wellbeing
    • COVID - Safer by Sharing
    • COVID MPA Resources
  • Awards
    • Enter
    • Event
    • Sponsorship
    • Guides
    • Videos
    • Entries
  • News
  • My Information
    • My Saved Files
    • My CPD Report
  • Home
  • Safety Resources
    • Incident Alerts
    • HiPos Report
    • Guidance
    • Good practice
    • Toolbox talks
    • Hot Topics
    • Other resources
    • Videos
    • Safequarry App
  • The Fatal 6
    • Overview
    • 1. Contact with moving machinery and isolation
    • 2. Workplace transport and pedestrian interface
    • 3. Work at height
    • 4. Workplace Respirable Crystalline Silica
    • 5. Struck by moving or falling object
    • 6. Road traffic accidents
  • Vision Zero
    • Overview
    • Employee Guide
    • Core Values
    • Fatal 6
  • Safer By
    • Overview
    • Safer by competence
    • Safer by association
    • Safer by design
    • Safer by partnership
    • Safer by sharing
    • Safer by Leadership
  • Public Safety
    • Summary
    • Stay Safe
    • Cycle Safe
  • Health & Wellbeing
    • Quarries Partnership - Dust
    • Mental Health & Wellbeing
    • COVID - Safer by Sharing
    • COVID MPA Resources
  • Awards
    • Enter
    • Event
    • Sponsorship
    • Guides
    • Videos
    • Entries
  • News
  • My Information
    • My Saved Files
    • My CPD Report

The Health and Safety Hub for the Mineral Products Industry - aggregates, asphalt, cement, concrete, contracting, dimension stone, lime, precast concrete, masonry, mortar, readymix, recycling, silica sand, transport & logistics

  1. Home
  2. BestPracticeView

Good Practice

LOCATION: Readymix or mortar plant ARTICLE YEAR 2022
ACTIVITY: Pedestrian and transport safety on-site COMPANY: Hanson
SUB ACTIVITY: No Sub Activity Available COMPANY LOCATION: Birmingham Readymix Plant
GOOD PRACTICE No: BP2171 COMPANY TEL: 0000
COUNTRY OF ORIGIN:
TITLE  
Trackside aggregate offloading – Pedestrian segregation intercom gateway
ARTICLE

Topic 4 - Highly Commended

Hanson concrete have opened a new flagship site in Birmingham. To reduce the need for additional road traffic in West Midlands the plant design and location centred around arrogate supply to the plant being by rail.

The site on Landor Street is leased from Freightliner and upon site inspection we noted there was a pedestrian walkway that ran the length of the track sidings that Freightliner we’re using to gain access to the shunting locomotive at the opposite end of the site.

Upon installation of our concrete site, it was clear that there would be a high risk of Freightliner operatives completing trackside operations coming into contact with our aggregate grab wagon operations – particularly as the volume of throughput increased.

Freightliner have a well-established workers union that we’re involved in reviewing site and worker health safety and wellbeing. They judged that in its existing state the walkway would not be a safe means of traversing the site for their operatives, however avoidance of its use was not reasonably practicable.

No rail offloads we completed until a safe means of using the pedestrian walkway and completing rail side aggregate offloading could be established.

please view te additional pdf for mor information about what was implemented to address this issue and view the video.

ARTICLE IMAGES




Request Futher Information
pdf document available
Go back to search critera
About
Mineral Products Association, 1st Floor, 297 Euston Road, London NW1 3AD
Tel: 0203 978 3400
Email: info@mineralproducts.org
MPA Logo
Contact
  • Privacy
  • Developed by OFEC
↑