After completing the BDP the delivery driver started the delivery. Part way through the delivery the high-level beacon activated. The driver stopped the delivery but was assured by customer staff that there was sufficient ullage.
The driver recommenced the delivery. After about 10 minutes bitumen came out of the overflow pipe resulting in approximately 50 litres being spilt. The high high level alarm failed to activate.
Root causes of the incident
- The contents gauge on the storage tank and the contents gauge in the control cabin had widely differing readings.
- As the contents gauge in the control cabin indicated that there was sufficient ullage it was assumed that the activation of the high-level beacon was an electrical fault. This was not the case.