During roof repair work on the cement mill building, two contractor operatives were observed working at height. Both were wearing individual safety harnesses and lanyards, but both lanyard systems were connected to the same endless sling safety line. One of the two planned cranes could not reach the required roof corner, so both operatives used the remaining crane. The shared-line arrangement was identified, and the work was stopped immediately. The arrangement was reviewed and corrected before work continued.
A review of the incident identified the following
- Inadequate planning and management control of the work at height activity
- Failure of the planning and management-of-change process to ensure that any deviation from the agreed work-at-height method was stopped, risk assessed and authorised before work continued.
The image below shows the location of the cranes and the area of the roof being worked on.