The investigation into this critical incident is ongoing – further lessons from this incident will be shared following completion of the full report.
The incident occurred at an aggregates wharf in May 2024. The concrete retaining wall was used for retaining wet silt. The incident occurred in the morning after some additional material had been added to the stockpile. An hour later the concrete retaining wall collapsed, the wall struck the edge protection around the area allowing silt to flow out of the stockpile area. No material left site or obstructed any walkways. The area was cordoned off to allow an investigation to take place.
The initial investigation has highlighted that structural defects with the wall had been identified in all previous structural assessments from 2019 as requiring replacement. These had not yet been completed. The image below was extracted from the last structural survey which had taken place in 2023.
The images below show the concrete wall structural collapse and damage to edge protection to silt bays May 2024